Contractor John Laing Ltd. |
|
|
|
Site New Reservoir, Brickhill,
Bedford |
|
|
Client Anglia Water Authority |
|
|
Date Mid - Late
2001 |
|
|
Description 22 metre and 36 metre
concrete pumps supplied to Laing at Bedford numerous times in
2001-2002. Radio remote control proved
invaluable for safe working as the operator was on the reservoir roof
during the placing process |
|
|
|
|
|
The Concrete Company's 36 metre concrete pump in
operation |
|
 |
|
|
Contractor
Marconi Communications |
|
Site
Leicestershire
|
|
Date
September 2001 |
|
Description
Readymix supply and pump supply to this concrete which was located
inside the courtyard of these buildings directly below the end of the
boom. The whole process took 30 minutes to transport 60 tonnes of
concrete to the jobsite. Our 36 metre concrete pump pictured here is
fitted with radio remote control which proved invaluable as the pump
operator needed to be positioned on the building roof to see safely. |
|
|
|
|
|
 |
Contracted by
Hart Properties |
 |
|
 |
Our Client's where |
Dolphin Telecommunications |
|
Contractor
Hart Properties (Lincoln) Ltd |
|
Site
Newark Road Peterborough. |
|
Client
Dolphin Telecommunications |
|
|
Date November 2001. |
|
Description
Special concrete mix to include steel fibre reinforcement and a super
plasticiser to increase workability. Nine truck turnaround was used on
these pours which were supplied from our Peterborough readymix plant. |
|
|
|
|
|